Plans in for £290m London gasworks resi project

Date: 24 Jan 2023

Joint venture developer SGN Mitheridge has submitted hybrid plans for the site, which is one of the last undeveloped sites in Wandsworth town centre

The mixed-tenure scheme is to be developed with four main buildings ranging from 10-30 floors and will cost around £290m to build over six years.

Read more here.

BACK
  • SHARE
Image 1 Blog
A Guide to Finding Quantity Surveyor Jobs in London
21 Jul 2023
TOP 10 SKILLS 1 Blog
Top 10 Skills That Construction Recruiters Look for in Candidates in 2023
24 May 2023
Site Engineer Job Interview Blog
Site Engineer Jobs: 7 Ways to Make an Impression During the Interview
28 Apr 2023