Watch UK’s heaviest bridge drive on HS2

Date: 20 Jul 2023

The UK’s heaviest drive to install an intersection bridge structure beneath the West Coast Main Line near Lichfield has been successfully completed on HS2 by Balfour Beatty Vinci.

The 56 metre long and 19 metre wide concrete structure weighs 6,200-tonnes and was built adjacent to the WCML over the last six months.

Read more here.

BACK
  • SHARE
Image 1 Blog
A Guide to Finding Quantity Surveyor Jobs in London
21 Jul 2023
TOP 10 SKILLS 1 Blog
Top 10 Skills That Construction Recruiters Look for in Candidates in 2023
24 May 2023
Site Engineer Job Interview Blog
Site Engineer Jobs: 7 Ways to Make an Impression During the Interview
28 Apr 2023